Ledwood Mechanical Engineering


steelwork for the North Wales wind farm site at Gwynt y Mor.

Ledwood have recently been awarded a contract to manufacture and supply transport and support steelwork for the North Wales wind farm site at Gwynt y Mor. .......more


Replacement of No. 4 Blast Furnace

LMEL are pleased to announce the recent contract award by Tata Steel Strip Products Limited for the procurement, fabrication and erection of the main furnace pipe work for the .......more


Total Lindsay Oil Refinery

Ledwood have recently completed a successful T&I at Total's oil refinery. Initially contracted in November 2010 to develop methodology and plan for their T&I in September 2011. Our team of experts reviewed the scope of works and presented the client with .......more


Quality Incentive Award

Fluor are delighted to report that this month we presented the projects first monthly Quality Incentive Award. Decembers award being presented to Derek Edwards and Wayne Williams of Ledwood mechanical engineering LTD .......more


Appointment of Corporate Health & Safety Manager

Rees Davies has proudly joined LMEL taking the post of Corporate H&S Manager after recently working for a leading national multi discipline contractor as a Regional HSE Manager covering South and West Wales and Southern England.......more


New Heater Technology for Major Gas utility company

Ledwood are currently working with GL Noble Denton as part of a project to select new gas heaters for the Major Gas utility company distribution network. Ledwood has overall responsibility for the installation of the heaters and as well as overseeing the civil and electrical work,.......more


Ledwood awarded the RoSPA “Order of Distinction”in recognition of its outstanding health and safety record



Recent Projects

Project

  • Chevron

Ledwood Mechanical Engineering has been commissioned by Chevron to provide a management and design team to carry out a detailed review of the operational capabilities and best practices of the existing CCR/CRU and VDU Heaters.

VDU Heaters Project: -

The VDU heater project includes the replacement of the existing Convection Boxes on both heaters with a full front end study of the heater operation with possible inclusion of a new Steam Generation System, installation of Air Preheater, new Ductwork, new ID and FD Fans, new Heat Exchanger and replacement Burners.
Chevron has contracted LME to provide the complete EPC mechanical package from the FEED stage, mechanical design, shop fabrication through to the full onsite installation which includes all heavy lifting requirements. The shop fabrication will take place at LME's main facility in Pembroke Dock during 2011 with the majority of the installation element of the project taking place during the 2012 turnaround.  

CCR/CRU Heater Project: -

The CCR/CRU (Platformer) heater project includes the replacement of existing outlet manifolds and down comers in the Radiant section of the heater. The shop fabrication will take place at LME's main facility in Pembroke Dock during 2011 with the majority of the site installation taking place during the 2012 turnaround.  
During the pre-turnaround phase of the project a new roof will be erected to give weather protection to the Radiant section of the heater. LME are responsible for the complete design, supply, fabrication and installation of new of the new roof which incorporates lifting beams for the removal of the outlet manifolds.  